154. The Minister renews a pipeline construction or use authorization for 5-year periods provided that the holder(1) pays renewal fees of $0.50 per linear metre of pipeline constructed;
(2) complied with the Act and its regulations during the previous validity period; and
(3) shows that the holder has gathered or transported petroleum during the last 60 months of the previous validity period.
The renewal application must be sent at least 120 days before the end of the previous validity period.
1253-2018O.C. 1253-2018, s. 154.